Name of the Project: Patuakhali 1320 (2x660) MW Coal Fired Thermal Power Plant
Project Location: Mouza: Dhankhali, Nishanbaria, Londa; Union: Dhankhali; Upazilla: Kalapara; District: Patuakhali.
Capacity: 1320 (2x660) MW
Project Cost: USD 2.54 Billion
Debt : Equity: 70:30
Required Land: 500 acres
Type of the Power Plant: Ultra Supercritical
Cooling System: Closed Cycle (Cooling Tower)
Source of Water: Rabnabad Channel
Mechanism: Low Nox Burner, Electro Static Precipitator (ESP), Flue Gas, De-Sulfurization (FGD), Induced draft Cooling Tower.
Power Evacuation: At 400 KV level to the National Grid
Fuel Type: Imported Coal (from Indonesia & Australia)
Coal Requirement: 12273 tons (daily); 4 Million tons (yearly)
Power Purchaser: Bangladesh Power Development Board (BPDB)