Company-Profile
Flagship Project

Company-Profile

Patuakhali 1320 MW Coal Fired Thermal Power Plant: Driving the nation's energy future with high-efficiency ultra-supercritical technology.

Project Overview

Generation Capacity
1320 MW

Dual units of 660 MW each. Unit 1 commissioned January 2025, Unit 2 April 2025.

Land Area
915.74 ACRES

500 leased + 30 for resettlement.

Established

21 December 2017

Coal Source

Indonesia

COD Target

April 2026

offline_bolt Operational Status

Unit 1

Jan 2025

Unit 2

Apr 2025

IOD

Sep 2025

COD Target

Apr 2026

About the Project

Name of the Project: Patuakhali 1320 (2x660) MW Coal Fired Thermal Power Plant

Project Location: Mouza: Dhankhali, Nishanbaria, Londa; Union: Dhankhali; Upazilla: Kalapara; District: Patuakhali.

Capacity: 1320 (2x660) MW

Project Cost: USD 2.54 Billion

Debt : Equity: 70:30

Required Land: 500 acres

Type of the Power Plant: Ultra Supercritical

Cooling System: Closed Cycle (Cooling Tower)

Source of Water: Rabnabad Channel

Mechanism: Low Nox Burner, Electro Static Precipitator (ESP), Flue Gas, De-Sulfurization (FGD), Induced draft Cooling Tower.

Power Evacuation: At 400 KV level to the National Grid

Fuel Type: Imported Coal (from Indonesia & Australia)

Coal Requirement: 12273 tons (daily); 4 Million tons (yearly)

Power Purchaser: Bangladesh Power Development Board (BPDB)

location_on Location Details

Dhankhali Union, Kalapara Upazila, Patuakhali District, Bangladesh. The site was chosen for its proximity to deep-water maritime access.

schedule Project Lifecycle

A long-term energy commitment with a total project lifespan projected over 25 years of continuous peak operation.

Technical Specifications

bolt
Technology Type

Ultra-Supercritical Coal-Fired

ac_unit
Cooling System

Closed-cycle Cooling Tower

settings_input_component
Steam Parameters

25 MPa / 600°C / 600°C

eco
Emission Control

FGD & ESP Systems Integrated

local_shipping
Fuel Transport

Deep-Water Jetty Access

electric_bolt
Grid Connection

National Power Grid (BPDB)

Financial Structure

Total Assets

BDT 266.4B

266,400,220,818

Total Equity

BDT 67.1B

67,112,804,321

Total Liabilities

BDT 199.3B

199,287,416,497

Revenue

BDT 5.59B

5,592,443,750

Net Profit

BDT 445.2M

445,248,290

EPS

1.04

Earnings per share

Capital Structure
Authorized Capital BDT 70B
Paid-up Capital BDT 52.9B
Share Value BDT 100
Equity Partners
RPCL
15%
Norinco
15%
Exim Bank of China
70%
Debt-Equity Ratio: 70:30

Management

Chairman

Major General S M Zia-Ul-Azim

Managing Director

A.H.M Rashed

Executive Director

Wang Chao

Infrastructure

Marine Jetty

Dedicated deep-water jetty facility designed to accommodate large coal carrier vessels for uninterrupted fuel supply.

Coal Storage

Large-scale covered coal storage facilities ensuring a continuous 30-day fuel supply buffer for uninterrupted operation.

Transmission Line

400 kV high-voltage transmission infrastructure connecting the plant directly to the national grid for bulk power evacuation.

Water Supply

River water intake system for the closed-cycle cooling towers, minimising freshwater consumption with efficient treatment processes.

Project Site

Dhankhali, Kalapara, Patuakhali. Strategically positioned for fuel logistics and distribution.

Open in Maps